Barn Remodel Week 4 – Windows! (and Lower Side)

A lot of progress was made this week:  the entire lower side (above the crush pad) was covered in boards and battens, and we put in three large windows where the old hay doors used to be.  We also added a window next to the entrance door on the upper side and four large windows were framed in on the back side!