Bathroom Remodeling – Week 2

 

We got the old bathtub out today – along with all the tiles that surrounded it.  Jens came over to help us with the heavy lifting and precision sawing to remove the 2×4’s.   The water to the bathroom is now obviously disconnected, and half the walls and the doorway are gone.  The copper pipes that led to the bathtub are pulled out as well.

We still have to remove a small wall by the sink, as we are going to put a larger sink into that spot.  But our next steps involve wiring and plumbing, which currently run through that small wall.  This will be more time consuming – but not nearly as dusty and dirty!

Posted in DIY