We are happy to report that the future tasting room now boasts a heating and cooling system, which we promptly turned to cooling. It is amazingly quiet and works great.
The other major addition this week was a commercial dishwasher!
Progress continues this week, as the handicap ramp is taking shape. The decking boards, posts and railings were installed on the ramp, which will end with a cemented landing. The deck also has a railing as of this week, and a door from the future tasting room to the deck was added.
The article below was published in the Central Penn Business Journal on April 27, 2018, written by Jason Scott. (an earlier version appeared in the online edition):
After all the excavating work, 6 truckloads of shale were spread out and then covered with 4 truckloads (about 86 tons) of gravel. After all this was done, a heavy roller pressed everything into place – and voilà – we have a driveway!