We finished pressure washing the rest of the barn ceiling early Saturday and also worked on the wiring some more. While the walls were drying off, we worked on the back fence row, cutting down low hanging tree branches and weed whipping. Also mowed around both ponds, between the grape vines and the blackberry rows and drug load of brush to the burning pile behind the garden.
The rain started late Saturday afternoon, and we worked in the barn after that. Jeff continued pointing the rocks on the back wall. Jens, Tina and Lars worked on insulating between the studs, and then cutting and hanging drywall. There were a lot of “tricky” pieces to cut, but Jens did a great job working around old crooked barn beams. By Sunday afternoon, the drywall was up!